Factory docs, home
Page navigation

See the input → responsibility → output diagram.

Status: Passive material timing evaluation. Build review records accepted snapshots and current verification gates. Real calendar sources and publishers need separate qualification.

A time can look convenient and still be wrong for a piece of work. A launch needs confirmed availability. A retirement notice must leave every approved notice period intact. An embargo prevents earlier publication, and a clock change can make a local time ambiguous or nonexistent.

A slender violet bob steadying a swinging metronome.

Meet the stage manager. Wait for the right beat. Checks a proposed time against notice periods, embargoes and clock changes. Meet the whole Plumb family.

Material Timing evaluates slots supplied by the caller against those facts. It keeps the exact material revision, evidence and calendar rules alongside its answer. Missing required evidence stays unknown. A planned release stays conditional even after its planned date passes. When two supported options have the same preference, they remain tied.

Audience preferences are explicit policy. Missing measurement produces a policy-only recommendation and a request to measure; it does not invent the best time to reach people. Old recommendations retain their original rules and time instead of changing when today's calendar or evidence changes.

The evaluator publishes nothing and reserves no channel. Try the installed example or read the agent contract. Durable proposals and delivery remain later parts of Temporal Planning.

Honest limits:

  • This passive candidate publishes nothing and starts no delivery.
  • Caller-supplied calendar rules and facts still need authentic source qualification.
  • Current snapshot checks and independent acceptance belong to the build review.

Source: docs/guide/material-timing.md